Bhadla 3 - Overview Home / Solar Parks / Bhadla 3 / Overview

The Bhadla Solar power park phase-III – 1000 MW is located at Bhadla village, Bap Tehsil, District Jodhpur. The location is 220 Kms from Jodhpur on Bap-Bhadla road, nearest railway station is located 80 kms from the park site. The Solar Park, starting point on Bhadla road is at 27.438017 Latitude; 72.048472 Longitude and ending point are at 27.501146 Latitude: 71.967173 Longitude. GoI has approved Bhadla III Solar park as an approved solar park under MNRE guidelines.

General Information and Current status:

  • The Park is divided into two phases namely; Phase-1 LHS (500 MW) being connected to STU – RVPN GSS and Phase-2 RHS (500 MW) being connected to CTU – PGCIL Sub-station.
  • The substantial completion for Phase-1 was completed in March 2018. Commissioning and power generation commenced in September 2018. Commercial Operations of Phase-1 of the Park have started as of October 2018.
  • Power generation from Phase-2 of the Solar Park is expected to commence from April 2019.